ModelWeave ยท Decision intelligence for industrial operations

Your bottleneck is eating into your profit margin.

ModelWeave, built and run by X24 Digital, finds the station that sets your line's pace and builds a cheaper plan around it: the run order, the stock in front of it and the roster. Every figure is explained in plain language.

The problem

Where the money goes on a production line

Most of the cost a planner can influence sits in four places. None of them shows up as a single line in the accounts.

Time lost to changeovers

Every changeover at the bottleneck station is output the whole line never gets back.

Fixed by Schedule optimisation

Orders going out late

Customers can fine late or short deliveries, and one late order often drags others with it.

Fixed by Schedule optimisation

Stock piling up between stations

Too much ties up cash and floor space; too little leaves the bottleneck station waiting.

Fixed by Inventory buffer optimisation

Overtime bill too high

Overtime often covers time lost elsewhere, and rosters built by hand rarely match the work.

Fixed by Workforce optimisation

How it works

From your planning files to a plan you can check

  1. Upload

    Orders, process steps, changeover times and shifts, from your ERP or a spreadsheet. Templates are provided.

  2. Optimise

    ModelWeave searches for a cheaper plan than your current one, within every rule you have.

  3. Stress-test and check

    The plan is tested against breakdowns and re-checked independently against each rule.

  4. Explain

    A plain-language results page and an Excel report show what changed and why it is better.

  5. Value realisation (ongoing)

    Benefits dashboard, model recalibration, optimisation backlog and quarterly CFO/COO value reviews.

Modules

Choose the decisions you want to improve

Run one module or combine them. Each one works from the same picture of your line.

Schedule optimisationFinds a cheaper run order, weighing changeovers against lateness, and names your bottleneck station.
Inventory buffer optimisationSets stock levels between stations and release times that keep the bottleneck station working.
Workforce optimisationBuilds a roster within your rest rules, with labour and overtime costed.
Two ways to use it

As a platform, or as a service

Service

Let us run it for you

We prepare your data from your ERP and MES, run the analysis and talk your team through the results and how to act on them.

  • Data preparation and checking
  • Results workshop with your planners
  • Ongoing runs as your plans change
Why trust the figures

Every statement says how it is known

ModelWeave labels each figure in its report as proven by arithmetic, measured by simulation, tested by trying an alternative, a stated default, or unknown. Nothing is called impossible unless it is proven.

See ModelWeave on your own data

Tell us what you make and which decisions you'd like to improve.